System Sign-Off
G1 Completion Certificates
G1 forms are created for manual power sources and combine project, source, inspection and declaration information.
Automatic certificates
The planner creates one G1 for each manual power source. Use the selector to move between certificates or add a named blank G1 where another electrically separate distribution needs documenting.
An automatically created G1 can be marked not required. It is then hidden from the form workflow and omitted from PDF output.
Supply information
Fields 6–10 can be configured in advance on an expanded manual power source: supply type and location, earthing arrangement, source protective devices, additional earthing and deliberate earthing-system interconnections.
These values populate the associated G1 automatically. Editing them on G1 creates a certificate-specific override without changing the power source.
Configure repeatable supply characteristics on the power source, then use G1 overrides only for certificate-specific corrections.
Maximum demand and completion
Maximum demand is derived from the applicable source and downstream calculated demand. It can be displayed in amperes or kVA and restored after a manual override.
Review all four parts, confirm the declaration and select Complete. Revoke completion if amendments are required.