Real distro structures
Use company distro models or build project-specific units with single-phase, three-phase, Socapex and Powerlock outputs.
LVA Power PlannerDocumentationConnected distribution design
Build a readable event power distribution hierarchy instead of treating every distro as an isolated schedule. Downstream connections remain linked to their parent output, allowing demand and phase loading to propagate through the complete system.
Use company distro models or build project-specific units with single-phase, three-phase, Socapex and Powerlock outputs.
Feed child distros from eligible outputs and navigate between connected parent and downstream equipment.
Automatically include the load of connected downstream distribution in parent circuits and source totals.
LVA Power Planner is an indicative planning and documentation tool. It does not independently verify or certify compliance with BS 7909, BS 7671 or any other standard. Responsibility remains with the competent person and relevant duty holder.