Load and demand
Compare connected and design load, apply circuit diversity and include power factor when calculating current and apparent power.
LVA Power PlannerDocumentationTemporary electrical design
LVA Power Planner connects temporary-power calculations to the sources, distribution equipment and circuits they describe. Designers can move from connected load to planned demand without rebuilding the same system across separate spreadsheets.
Compare connected and design load, apply circuit diversity and include power factor when calculating current and apparent power.
Review cable capacity, parallel runs, derating, section voltage drop, cumulative voltage drop and estimated end voltage.
Propagate downstream distro demand through upstream circuits so calculations remain tied to the planned distribution hierarchy.
LVA Power Planner is an indicative planning and documentation tool. It does not independently verify or certify compliance with BS 7909, BS 7671 or any other standard. Responsibility remains with the competent person and relevant duty holder.